ASME B31.3 Pressure Testing
Cassandra Painter Cassandra Painter

ASME B31.3 Pressure Testing

Required Leak Test ASME B31.3 345.1

Prior to the operation of process piping subject to the jurisdiction of ASME B31.3, and after the completion of the required examinations required by paragraph 341 each piping system shall be pressure tested to ensure tightness.

Read More
Quality Turnover Package
Quality, Weld Inspector Cassandra Painter Quality, Weld Inspector Cassandra Painter

Quality Turnover Package

A quality turnover package in construction, particularly for welding-intensive projects, is a collection of documents that verifies the quality, compliance, and traceability of work performed during a project. It is compiled to demonstrate that work, including welding, meets contract specifications, industry standards (e.g., AWS, ASME, API), and client requirements. The package is typically submitted to the client or project owner at the completion of a project phase or the entire project to facilitate handover, final acceptance, or commissioning.

Read More
Weld Inspector Duties
Cassandra Painter Cassandra Painter

Weld Inspector Duties

Weld inspector duties vary depending on the industry but generally consist of activities before, during, and after welding occurs. Common duties include verification of welding procedures and certifications before welding begins, visual inspection of welds during and after welding is complete, and documentation of inspections performed.

Read More
Piping Walkdown Checklist
QC, Weld Inspector, Filler Metal, Base Metal, NDE, CODES, WPQ, WPS Cassandra Painter QC, Weld Inspector, Filler Metal, Base Metal, NDE, CODES, WPQ, WPS Cassandra Painter

Piping Walkdown Checklist

A piping walkdown checklist is used in industrial construction to verify that piping systems are built and installed correctly.

The piping walkdown checklist involves physically inspecting the piping system on-site to ensure all components, connections, and configurations align with the approved piping and instrumentation diagrams (P&IDs), isometric drawings, and project specifications.

Read More
B31.3 Closure Welds
ASME B31.3, Welding Codes Cassandra Painter ASME B31.3, Welding Codes Cassandra Painter

B31.3 Closure Welds

A closure weld, also called a golden weld, as defined in the ASME B31.3 Process Piping Code, is the final weld connecting piping systems or components that have already been successfully leak tested.

If the strict rules of ASME B31.3 paragraph 345.2.3(c) are followed, the closure weld will not need to be leak tested. To qualify as a closure weld specific in-process, and volumetric examinations are required. The in-process examinations include some of the following, joint preparation, cleanliness, preheating, fit-up, internal alignment, WPS variables, filler metal confirmation, joint position, VT and MT or PT of root pass, VT between passes, VT of final weld, with RT or UT of the final.

Read More
Hydrotesting Procedure
Cassandra Painter Cassandra Painter

Hydrotesting Procedure

Hydrotesting, or hydrostatic testing, is a procedure used to verify the integrity and strength of piping systems, pressure vessels, or components by filling them with a liquid (typically water) and pressurizing to a specified target value.

Read More
Common Quality Procedures
Cassandra Painter Cassandra Painter

Common Quality Procedures

In industrial construction, quality procedures aligned with ISO 9001 or similar quality management systems (QMS) are critical to ensure safety, compliance, and project success.

Read More